Load-shedding To Be Reduced by 1 hour From Friday (New Schedule)

The Nepal Electricity Authority (NEA) today announced to reduce load-shedding by 1 hour daily to be effective from Friday, May 20, 2016 (Jestha 07, 2073).

The state-owned power monopoly said that the reducing power outage hours was possible owing to increase in level of water in rivers. Updated schedule is yet to be published by the authority.

Loadshedding Schedule 2016

Leave a Reply